Veridian Plumbing and Infrastructure Group
Veridian Plumbing and Infrastructure Group
  • Home
  • About
  • Services
  • OBIC Systems
  • Our Work
  • Featured Projects
  • More
    • Home
    • About
    • Services
    • OBIC Systems
    • Our Work
    • Featured Projects
Request a Quote

  • Home
  • About
  • Services
  • OBIC Systems
  • Our Work
  • Featured Projects
Request a Quote

Wastewater Infrastructure Rehabilitation

Manhole Rehabilitation

Lift Stations & Wet Wells

Lift Stations & Wet Wells

Address infiltration, deteriorated concrete or brick, and corrosion with surface preparation, repair and an OBIC protective lining.

Lift Stations & Wet Wells

Lift Stations & Wet Wells

Lift Stations & Wet Wells

Rehabilitate wastewater collection structures with a coordinated approach to access, preparation, repair and protective lining.

Wastewater Treatment Structures

Wastewater Treatment Structures

Wastewater Treatment Structures

Protect headworks, pump stations and other treatment structures exposed to demanding wastewater conditions.

Specialty Protective Linings

Wastewater Treatment Structures

Wastewater Treatment Structures

Project-specific OBIC solutions for culverts, industrial trenches and containment, and potable-water infrastructure.

Preparation. Protection. Documentation.

Assess the Structure

Review substrate condition, corrosion, infiltration, access and operating requirements with the owner and project team.

Control Active Infiltration

Locate leaking joints, cracks and penetrations. Use appropriate injection grout or repair materials to control active infiltration before lining; a finish coating is not a substitute for leak-stopping preparation.

Prepare the Surface

Clean the substrate and remove unsound material or failed coatings as required for the specified system.

Repair Deteriorated Areas

Rebuild damaged surfaces, benches and inverts where included in the project scope.

Select the Right System

Match OBIC Armor, 5000, 1200, 1050 or 1100 PW to the application, exposure and project requirements.

Apply the Protective Lining

Install the specified lining system on the prepared substrate using manufacturer application requirements.

Inspect & Document

Provide structure-specific photo documentation and record the inspections and thickness checks required by the approved scope. Coordinate holiday (spark) testing, adhesion testing and acceptance criteria where specified. Include applicable warranty documents in project closeout.

Coordinate Return to Service

Confirm cure and service requirements for the selected system. Timing depends on site conditions and the approved project requirements.

request a quote

Discover Our Work

    • Our Work
    • Contact Us
    • Resources

    Veridian Plumbing and Infrastructure Group, Inc.

    OBIC Lining & Infrastructure Rehabilitation • Georgia | Alabama | Florida

    404-821-5258 | info@veridianpi.com

    Copyright © 2026 Veridian Plumbing and Infrastructure Group - All Rights Reserved.

    Powered by

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept